Site assessment and load review
Review the intended application, essential loads, starting demand, phase, available space, access and the existing electrical supply.
Contact
Plan a dependable generator system around your site’s load, operating priorities and existing electrical infrastructure.
Generator Warehouse can support commercial and industrial diesel generator projects from equipment selection and site planning through to integration, commissioning and handover, subject to the agreed project scope.
A commercial generator is part of a wider power system. The generator rating matters, but so do starting loads, phase, switchgear, cable routes, fuel arrangements, ventilation, exhaust, acoustics, access and the way the system should respond when mains power fails.
The starting point is the requirement: what must remain powered, how quickly it must transfer, how long it needs to run and what infrastructure is already on site. That information shapes the generator specification and installation plan.
Review the intended application, essential loads, starting demand, phase, available space, access and the existing electrical supply.
Select a generator and control arrangement suited to the duty, runtime and operating environment, including automatic transfer equipment where required.
Plan delivery access, lifting, final position and the supporting base, together with any agreed cable, fuel, exhaust, ventilation or acoustic works.
Coordinate the generator, switchgear, controls and site services against the approved design and agreed responsibilities.
Check the completed system, prove the agreed operating sequence and provide the relevant handover information. Testing requirements are agreed in advance and can include automatic-transfer operation or load testing where specified.
The final quotation should state the exact inclusions, exclusions and responsibilities for Generator Warehouse, approved partners and other site contractors.
Backup power may be needed for essential building services, refrigeration, security, communications, point-of-sale systems or other business-critical equipment.
Industrial projects can combine high loads, motor starting demand, sensitive processes and restricted shutdown windows.
Share the application, supply details and known loads and the team can help identify the right next step.
Where loss of mains power would interrupt essential operations, an automatic standby system can monitor the supply and start the generator when required. The transfer sequence, supported circuits and return to mains should be designed around the site.
An installation may use an automatic transfer switch or another approved changeover arrangement. Generator capacity, switchgear rating and cable sizing must suit the assessed load and system design.
Commercial generator work involves more than selecting a machine. Access, delivery, positioning and the operating environment all shape the final plan.
Share the site location, application, known loads, supply details, required runtime and available drawings.
Review access, positioning, electrical integration, fuel, exhaust, ventilation, noise and enabling works.
Define the proposed generator, controls, scope, responsibilities and assumptions.
Agree access, lifting, programme, isolation requirements and coordination with other contractors.
Complete the authorised work against the agreed design, scope and site requirements.
Test the agreed functions, record the outcome and provide the relevant operating information.
Providing the following information will help the team understand the project and identify the appropriate next step:
These examples show commercial and industrial supply experience. Each card states the published Generator Warehouse scope.
A 200kVA Perkins generator supplied and commissioned for a shopping centre; the customer’s contractor handled installation.
A CAT canopied generator supplied to an automated packaging systems company.
A Perkins generator supplied for a soil-remediation plant in Wales.
Tell us what needs to stay powered, where the generator will be located and what you already know about the site’s electrical supply.
Cost depends on the generator, switchgear, cable routes, positioning, lifting, fuel system, exhaust, ventilation, acoustic requirements, enabling works and commissioning scope. A project-specific assessment is more reliable than a generic installation price.
Sizing starts with the loads that must operate together and the starting demand of motors, pumps, compressors and other equipment. Required runtime, phase, future capacity and the role of the generator also matter.
Yes. A properly designed standby system can monitor the mains supply and start the generator automatically. The changeover equipment and operating sequence must be compatible with the site and circuits being supported.
Timescales vary with equipment availability, site access, enabling works, switchgear, design approvals and the required shutdown window. The programme is confirmed after the site and scope have been assessed.
Requirements depend on the site, generator position, enclosure, fuel storage, exhaust, noise and local constraints. Establish which permissions and specialist advice are needed before work begins.
If you need backup power for a home, contact the team with the property details and required loads. They can confirm the appropriate generator options and current installation route.